Home

About Us

Our VMA

Maintain V70, V70XC, S70, C70, XC90

For Sale

The Restoration Process

Completed Restorations

Finding The Right, Complete Car

New Acquisitions

Current Restoration Projects:

'62 Volvo 544 Red FOR SALE

'63 Volvo 544 (White)

'64 Volvo 544

'65 Volvo 122

'65 Volvo 544 Red

'65 Volvo 544 Blue

'67 Volvo 210

'68 122S

'68 Volvo 1800 Red

'69 Volvo 1800

'71 Volvo 1800E Green

'71 Volvo 1800E  

'73 Volvo 1800ES (finally!)

'78 Volvo 242

Save the 240!!!!

Favorites

P1900 Photo Gallery

Suggested Links

1963 Volvo 544 (White)

 

10/18/06: Disassembly process started

10/31/06: Firewall accessories stripped, engine still in place

Beginning to remove engine

Engine removed!

Front of engine bay area

Engine after cleaning

11/01/06

11/08/06: Engine out of the car, before disassembly

Engine with the pan off

Enging with timing cover off

Gooseneck after sandblasting, you can see perforations

Engine accessories before processing

Head off of engine, showing condition of pistons

Sump off of the engine, showing the lower end

11/09/06: Block stripped to send out for machine work

BAD PISTONS!!!!!

New, original stock, pistons and rings-very exciting. The pistons are +.03 overbore

11/30/06: Nickel plated engine hardware

December 2006: Engine back from the machine shop, being cleaned

(top view of same)

Main bearings, caps, and connecting rods being cleaned

Block cleaned, and ready to take new parts

Connecting rods, bearings and caps cleaned and ready to be installed

Crankshaft fitted to block and plastigauged

Main bearings installed

Pistons being fitted to connecting rods

Engine reassembled and ready for final round of painting

Trunk hinge being repiared

The trunk lid on the left is a better part than the one off of the car...so we'll work with that one

Original battery box being removed

Old battery box removed

Replacement battery box fitted, ready to be installed

Carl preparing the battery box hole for installation

Battery box installed, outside view

inside view of installation

Rear valence area: old and new

Rear area sandblasted, with valence removed

Spare wheel compartment, perferations showing after sandblasting

Driverside fender mounting area, showing perferations after sandblasting

Passengerside fender mounting area, showing perferations after sandblasting

Engine intake/exhaust manifold installed

January 2 2007: Passenger side inner well-rust penetrated area cut out

Engine nearly complete

Passenger side: body stripped

Stripping roof with 80 grit

Driverside rear quarter panel stripped

Generator apart

Rebuilding generator

Starter before processing

Body 90% stripped

Topically sandblasting rust pits

Starter apart for rebuilding

Starter body apart for rebuilding

1/10/07: New, beautiful, spare wheel well

3/20/07: Trunk floor with rear valence removed

Passenger side rear showing rear valence removed and area sandblasted

Rear valence replacement panel and trunk lid being fitted

Rear valence being fitted (before the trunk floor is installed)

Outside view of rear valence being fitted

Rear valence to fender seam (must be almost perfect fit for good lines)

Trunk floor panel being fitted with new valence in place

Starting to weld rear valence

Rear view of sheet metal assembled

Rear sheet metal fitted and ready for welding

Entire trunk floor after installation

Trunk floor welded-shows the welds have been finished off

Seamless installation of new trunk floor piece

3/19/07: Spot blast rust pits on roof

Spot welded in place, NEW spare tire well

Trunk interior prep

New spare tire well in, spot welded in place, trunk interior prep

Body spot blasted

Body work roof

Body work, driver side front corner

Body work passenger side front corner

Body work on the roof

Undercoating stripped from chassis

under floors being prepped

undercoat all stripped

Undercoat

Floor pan and rocker panel view from under-perfect condition

3/23/07: Passenger front floor stripped

Rear floors stripped

Driver side front floor stripped: ready for sand blasting

Trunk floor: ready for refinishing

Rear valence interior prepped

Driver side door opening post dent removal from door over swing

Driver side front 1/4 panel, rear 1/4 panel: body work begun