| Work done in
the shop: -VMA
-Replace ignition cap/rotor/wires
-replace (2) wiper blades
-Change oil
-Replace transmission gasket
-Replace front brake pads, turn rotors, rebuild (2) calipers, bleed
-Flush transmission
-install (4) Michelin tires 185R14
-Replace rear shocks, front struts
-Replace left front a-frame bushing
-Replace Left front tie rod end and steering rod
-Replace right lower ball joint
-Align Front End |